TL;DR (human)

Eight rules. They make multi-author work additive instead of subtractive. Without them, the second agent silently undoes the first agent's work; the third reviewer cannot tell what changed; the fourth release ships a regression that "no one merged".

  1. Every PR declares intent up front.
  2. Merges sum work — removing peer work needs explicit justification.
  3. Decisions are documented (ADR / RFC) before they ship.
  4. Tombstone retired work; never silently delete.
  5. One sub-unit per PR; one PR per session.
  6. Verify-first close — confirm the issue is still open before "fixing" it.
  7. Concurrent agents notice each other (search, fetch, check state).
  8. Phased work ships in a chain; each phase is independently complete.

For agents

Rule 1 — Every PR declares intent up front

Each PR has a manifest in the description (or a pr-intent.yaml file in the diff). The manifest lists:

  • summary — one sentence.
  • adds — new exported symbols, new files.
  • changes — existing symbols whose behavior changed.
  • removes — symbols / files deleted.
  • tests — tests added / updated.
  • docs — docs added / updated.
  • gates — gates expected to be green.

A gate parses the manifest and verifies it against the diff. Mismatch fails the PR.

Template: ../../templates/PR-intent.template.md.

Failure mode prevented: PRs whose description does not match the diff; reviewers approving claims that the diff contradicts; agents quietly expanding scope mid-session.

Rule 2 — Merges sum work — removing peer work needs explicit justification

Two specific protections:

  1. removes: is mandatory. If your diff deletes an exported symbol you did not author, the manifest must include a removes: entry with a justification (why this is safe; what replaces it).
  2. merge-override: for --theirs/--ours. If you used those flags to resolve a conflict, the manifest must include a merge-override: entry explaining why dropping one side was correct.

The gate fails the PR if either is missing when the diff calls for it.

Failure mode prevented: agents silently dropping peer work during conflict resolution; agents deleting "obsolete" code that turns out to be used by another package.

Rule 3 — Decisions are documented (ADR / RFC) before they ship

Architecture changes → ADR. Breaking-contract changes → RFC.

The doc IS the change. The code implements the doc. A PR that ships architecture without a referenced ADR is incomplete.

Cross-cutting reference: ../architecture/adr-pattern.md, ../architecture/rfc-pattern.md.

Failure mode prevented: rules that "everyone knows" but no one can cite; future agents reverting decisions because they cannot find the rationale.

Rule 4 — Tombstone, never silently delete

When a doc / plan / ADR / screen / package is retired:

  1. Prepend a tombstone block:

    > 🪦 **TOMBSTONED \<YYYY-MM-DD\>** — superseded by [\<link\>](./...). Kept for trail.
  2. Keep the body.

  3. Update the back-references (index pages) to mark it retired without removing the link.

Why: the doc / decision / plan is part of the historical record. Future agents may need to understand why it existed and why it was retired. Deletion loses both.

Exception: purely generated artefacts (build outputs, CI reports). Tombstone source-of-truth content, not build artefacts.

Failure mode prevented: retired plans re-discovered six months later because no one knows they were retired; conflicting docs because the old version was deleted instead of marked.

Rule 5 — One sub-unit per PR

A sub-unit is one discrete, shippable change.

  • Cross-cutting refactor → split into one PR per affected package, chained.
  • "While I'm here" expansions → split into a follow-up PR.
  • A bug fix bundled with a refactor → split.

The reviewer must be able to read the PR end-to-end and understand the intent in one sitting. If they cannot, the PR is too big.

Failure mode prevented: PRs that combine unrelated changes; reviewers approving a refactor along with a bug fix without verifying both; subsequent agents reverting half the PR because they only understood the other half.

Rule 6 — Verify-first close

Before "closing" an issue:

  1. gh issue view \<n\> --json state — is it still open?
  2. Re-read the issue's DoD. Did your work meet it?
  3. Look at peer-closed PRs referencing the same issue. Did someone close it concurrently?

This was the single highest-yield governance discipline in production multi-agent work — agents repeatedly grinding on already-closed issues.

Failure mode prevented: dup PRs that get rejected; agents claiming "fixed" issues they did not actually meet the DoD for.

Rule 7 — Concurrent agents notice each other

Before starting work in a path:

  • gh pr list --search "is:open \<path-fragment\>" — are peer PRs touching this?
  • git log origin/main..HEAD --name-only — what has main changed since you forked?
  • Read peer PR descriptions. You may be redundant.

This is search, not coordination. The agents do not have to talk; the repo records who is doing what.

See ../ai-collaboration/concurrent-agent-pattern.md for the full defensive checklist.

Failure mode prevented: two agents producing two PRs for the same fix; conflict storms at merge time; agents reverting each other's work in successive PRs.

Rule 8 — Phased work ships in a chain

Big initiatives are too large for one PR. Split into phases:

  • Each phase is independently shippable (passes gates, is reviewable).
  • Each phase is merged with --admin (after gates pass) before the next phase opens.
  • The next phase forks from fresh main, not from the previous phase's branch.
  • A tracker issue lists all phases with their status.

Why merge before opening the next phase: keeping a chain of N open PRs causes catastrophic conflicts as main moves. One-at-a-time costs slightly more wall-clock; saves enormously in conflict resolution.

Failure mode prevented: mega-PRs that cannot be reviewed; long-lived branches that conflict catastrophically with main; "phase 2 PR" that no longer applies cleanly because the assumptions of phase 1 changed.